天天干天天操天天射_蜜桃网址_japanxxxvideo_97久久人人爽人人爽人人

EN
The flue gas cleaning (FGC) project undertaken by Huaxing East for Tangshan Luanzhou WTE plant in Hebei Province passed 72+24 hours trial operation
2022.12.02
The FGC project undertaken by Huaxing for Tangshan Luanzhou WTE plant in Hebei province passed 72+24 hours trial operation on November 19, 2022.
The average waste treatment capacity of the plant is 500 t/d. The FGC process applied "SNCR in-furnace ammonia injection (not the scope of contractor) + semi-dry reaction tower with lime slurry solution (not the scope of contractor) + dry method with lime powder (not the scope of contractor) + activated carbon injection adsorption (not the scope of contractor) + bag filter (not the scope of contractor)+ sodium bicarbonate grinding + GGH + SGH (steam-gas heat exchange) + SCR ammonia solution". It is an EP project of Huaxing.
The achievements of Huaxing East in Hebei Province include Xia Nenxin of Shijiazhuang, Hengshui, Caofeidian, Weichang, Baoding phase I & II, Shunping, Tangshan phase I & II, North Zhangjiakou, Gu'an, Xianghe, Dingzhou, Cangzhou phase I, Shijiazhuang, Anping, luanzhou, Shahe, etc.
For more information, please click or scan below!
Follow us!