天天干天天操天天射_蜜桃网址_japanxxxvideo_97久久人人爽人人爽人人

EN
The flue gas cleaning project of the Dongqiao domestic waste incineration power generation project in Ningbo City, Zhejiang Province, undertaken by Jiangsu Huaxing East Electric Power Environmental Protection Technology Co., Ltd, has commenced the construction work of the project
2023.10.30
The flue gas cleaning project of the Dongqiao domestic waste incineration power generation project in Ningbo City, Zhejiang Province, which is undertaken by our company, the construction work commenced on October 24, 2022.
The first phase of the project has a construction scale of 1500t/d, equipped with 2x750t/d grate furnace type waste incinerator and 2 flue gas cleaning treatment lines, 1x45MW condensing steam turbine and 1x50MW generator, and reserves 750t/d for the second phase, the design scale of the Flue gas cleaning adopts "SNCR furnace denitrification + mechanical rotating spray semi-dry method (including emergency cooling system) + hydrated lime dry injection + activated carbon injection adsorption + bag dust collector + GGH1 + wet deacidification + GGH2 + SGH + SCR denitrification ( Low temperature) + fly ash transportation, storage and stabilization process, a complete flue gas cleaning process, supplied by our company's for this project.
Huaxing East Co's previous performance in Zhejiang Province includes: Ningbo Dongqiao, Ningbo Cixi Phase I, II, III, Ningbo Yinzhou, Lanxi, Shaoxing Shangyu, Lishui, Lishui Qingtian, Huzhou Deqing, Huzhou Anji, Ningbo Fenghua, Hangzhou Jiande , Jinhua, Jiaxing, Jiaxing Haiyan, Jiaxing Haining, Wenzhou Pingyang, Wenzhou Yongjia, Quzhou Longyou, Taizhou, Taizhou Wenling and other projects.
Click or scan below for more information!

Follow us!